Size: 120,000 Sqft. Date Completed: Nov 2019 Scope Of Work: We tore off an existing SPF roof and installed a temporary EPDM membrane to dry in the deck. We then Installed 2.6" flat ISO with a full 1/4" tapered system as well as new 60 Mil TPO. We also designed and installed a new permanent ballasted collapsible guardrail system around the entire perimeter.
Size: 300,000 Sqft. Date Completed: May 2020- Present Scope Of Work: This was an overlay. We removed the existing ballasted rock and then proceeded to install a 3" Iso board as well as a 1/2" densdeck and 60 Mil EPDM fully adhered. We also designed and installed a new ballasted guardrail system around the entire perimeter.
Size: 10,000 Sqft. Date Completed: July 2020 Scope Of Work: We began by tearing off an existing TPO roof as welkl as 6" of Iso down to the existing deck. We then installed new 6" iso as well as a new 60 Mil EPDM system fully adhered.
Size:24,000 Sqft. Date Completed: October 2020 Scope of Work: We began by tearing off the existing BUR and 6" iso system down to the existing deck. We then installed new R30 iso with crickets as well as a new modified bitumen roof system. We also installed a new permanent guardrail system.
Size: 50,000 Sqft. Date Completed: 2004 Scope Of Work: We began by tearing off the existing TPO as well as 6" of Iso down to the existing deck. We then installed 6" of Iso as well as a new 60 Mil TPO roof system.
Size: 100,000 Sqft. Date Completed: 2001 Scope Of Work: We began by tearing off the existing BUR and R30 Iso down to the existing deck. We then Installed new R30 Iso and a 60 Mil TPO roof system mechanically fastened.
Size: 1,000,000 Sqft. Date Completed: 2000-2005 Scope Of Work: We began by tearing off the existing BUR and 6" of tapered Iso down to the existing deck. We then built all new wood curbs and expansion joints. Lastly we installed a new R30 tapered system as well as 60 Mil PVC.
Size:20,000 Sqft. Date Completed: 2016 Scope Of Work: This was an overlay. We began by installing a 1/2" coverboard and then finished off the system with a fully adhered 60 Mil TPO.
Size: 25,000 Sqft. Date Completed: 2016 Scope Of Work: This was an overlay. We began by installing a fully adhered 1/2" cover board, and finished the system by installing a fully adhered 60 Mil EPDM roof system.